University Hall and Kitchen Roof Replacement

Roof areas 2, 10 and 10A of the University Center will be replaced. For roof area 2 all roofing and insulation will be torn off to the metal deck. The metal receiver and flashing can be reused. Insulation to achieve an R value of 25.2 and then a full adhered 0.060 EPDM membrane will be installed. For roof areas 10 and 10A all roofing material and insulation will be removed to the concrete deck. Insulation to achieve an R value of 25.2 and then a fully adhered 0.060 EPDM membrane will be installed.