University Exterior Sealant Repairs

Building Envelope Repair Project replaced all building sealant from the parapet down to the fifth floor windows. The work included all brick masonry to precast/cast-in-place concrete, precast to cast-in-place concrete aluminum to glass and aluminum to aluminum transitions at the subject locations. Aluminum to brick masonry transition sealant at the subject locations was included as an additive alternate.