Building Envelope Evaluation & Rehabilitation Projects

44 buildings

Since 2000 ICA has partnered with Kenosha Unified School District to develop a sustainable proactive management system for its growing facility inventory. Since then, ICA had completed over 100 successful projects ranging from$10,000 to $10,000,000. ICA performs preliminary condition assessments; failure investigation; research and review archival documentation; develop measured baseline drawings; critical roof/façade examination; roof, wall and window rehabilitation design documentation and specifications; bidder prequalification; bidding phase services; structural analysis and monitoring; construction phase services including preparation of daily field reports, photographs and computer as-built drawings as permanent record of the work and verification of the contractor’s adherence to specifications.