Building Envelope Evaluation and Rehabilitation Projects.

3 Buildings including 2 High School campuses

Ice Center, transportation buildings, athletic press box and concessions

Roof, wall, window rehabilitation projects.

ICA has developed a strong reputation for our abilities to assess, analyze and solve building envelope issues. At Arrowhead Union High School District we have developed, with excellent personnel, a path toward addressing their most urgent needs while keeping a close eye on upcoming work and forecasting major expenditures out for 30 years. Solid information and comprehensive analysis has been the key to our success. ICA performs preliminary condition assessments; failure investigation; research and review archival documentation; develop measured baseline drawings; critical roof/façade examination; roof, wall and window rehabilitation design documentation and specifications; bidder prequalification; bidding phase services; structural analysis and monitoring; construction phase services including preparation of daily field reports, photographs and computer as-built drawings as permanent record of the work and verification of the contractor’s adherence to specifications.